Commissioning check the functions of the Siemens PLC Cargo terminal control system
Design, supply, startup and commissioning of the Cooling Water Pump, PLC for the operation, protection and monitoring of the Turbine cooling water pumping system.
Design, supply, install, startup and Commissioning the Precipitators dust level monitoring and control system for all four units of CPA Siemens PLC S7-300 and HMI
Complete replacement of the piping system, pumps, control valves and the dosing controls using a group of Siemens S7-300 (Master) and S7-200 (Salve) PLCs.
Supply, Panel Fabrication, Programming, Panel Installation and Commissioning of the PAC dosing control system. Allan Bradley Compactlogix PLC
Panel Design and Fabrication, PLC and HMI programming and commissioning of Compressor cooling control for CPB Allan Bradley Compactlogix PLC and HMI for the operation, protection and monitoring system.
Panel Design and Fabrication, PLC and HMI programming and commissioning of Frozen Food Room control. Allan Bradley Compactlogix PLC and HMI for the operation, protection and monitoring system.
Panel Design and Fabrication, FAT around 30 panels. Relay control and. Allan Bradley VFD for the operation, protection and monitoring system.